Construction of the Natural Gas Boiler House in the “Southeast” District of Astana City
As part of the project completed in 2023, the reinforced concrete works of the natural gas boiler house located in the Southeast district of Astana were successfully carried out over 8 months. This vital facility, which contributes to the city’s infrastructure, was constructed with a safe and durable structure.
“Construction of the Natural Gas Boiler House in the “Southeast” District of Astana City
- Project Location: Astana / KAZAKHSTAN
- Category: Reinforced Concrete
- Project Volume: 4,673 m²
Delivery Date: January 2023